NISMO

50x Kemet 4.7uf 25V 10% Radial Long Lead Tantalum Capacitors NEW!

Description: This listing offers a lot of 50 Kemet 4.7uf 25V 10% Radial Tantalum Capacitors with long leads and a 2mm lead spacing, suitable for PCB mounting. These fixed capacitors have a ±10% tolerance rating and feature a tantalum electrolytic (polarized) construction with radial termination style. The packaging is bulk, making it easy to store and access these capacitors for use in electronic projects. With a capacitance rating of 4.7uf and a maximum operating voltage of 25V, these capacitors are ideal for use in a variety of electrical equipment and supplies, including guitar effects pedal circuits. Please feel free to contact me with any questions.

Price: 9.95 USD

Location: Berthoud, Colorado

End Time: 2024-11-23T23:15:51.000Z

Shipping Cost: 4.95 USD

Product Images

50x Kemet 4.7uf 25V 10% Radial Long Lead Tantalum Capacitors NEW!50x Kemet 4.7uf 25V 10% Radial Long Lead Tantalum Capacitors NEW!50x Kemet 4.7uf 25V 10% Radial Long Lead Tantalum Capacitors NEW!50x Kemet 4.7uf 25V 10% Radial Long Lead Tantalum Capacitors NEW!

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: Kemet

Mounting Style: PCB Mount

Type: Fixed Capacitor

Capacitor Construction: Tantalum Electrolytic (Polarized)

Tolerance Rating: ±10 %

Termination Style: Radial

Packaging: Bulk

Capacitance Rating: 4.7uf

Maximum Operating Voltage: 25 V

Recommended

12 pcs - .22uF (224) @ 100V (5%) (KEMET) Multilayer Ceramic Monolithic Capacitor
12 pcs - .22uF (224) @ 100V (5%) (KEMET) Multilayer Ceramic Monolithic Capacitor

$5.99

View Details
Kemet Board Game (1st Ed) w/Ta-Seti Expansion (Single Box) With Promo Tiles
Kemet Board Game (1st Ed) w/Ta-Seti Expansion (Single Box) With Promo Tiles

$65.00

View Details
Matagot Collection XL Kemet Board Game, 2012, Complete In Box, Good Condition
Matagot Collection XL Kemet Board Game, 2012, Complete In Box, Good Condition

$19.99

View Details
Ancient Spiritual Mystery Teachings Of Kemet ( Ancient Egypt): The Original...
Ancient Spiritual Mystery Teachings Of Kemet ( Ancient Egypt): The Original...

$17.93

View Details
Egyptian Empty Mouthblown  Perfume Bottles (Set of 6 ) Kemet Art 3,5 Inches
Egyptian Empty Mouthblown Perfume Bottles (Set of 6 ) Kemet Art 3,5 Inches

$29.99

View Details
Kemet 1st Edition Ta-Seti Expansion Set NEW SEALED Board Game Matagot
Kemet 1st Edition Ta-Seti Expansion Set NEW SEALED Board Game Matagot

$71.99

View Details
Kemet T495D107K010ATA100 Capacitor Quantity 500
Kemet T495D107K010ATA100 Capacitor Quantity 500

$328.48

View Details
Sons Of Kemet ‎– African Cosmology - 12" Vinyl EP!! MINT!
Sons Of Kemet ‎– African Cosmology - 12" Vinyl EP!! MINT!

$6.99

View Details
LOT OF 50 KEMET 100uF 16V 10% SMD LOW ESR TANTALUM CHIP CAPACITORS - CASE "X"
LOT OF 50 KEMET 100uF 16V 10% SMD LOW ESR TANTALUM CHIP CAPACITORS - CASE "X"

$29.95

View Details
Kemet - Blood and Sand - God Pledge Kickstarter Edition - Sealed - Matagot Games
Kemet - Blood and Sand - God Pledge Kickstarter Edition - Sealed - Matagot Games

$175.00

View Details